Greenbuildermedia iconGreenbuildermediaSep 21, 2026

Climate-Ready Construction Includes Solar Panels

In our electricity-dependent world, being without power for an afternoon or a night can seem impossibly frustrating – and is life-threatening for people who rely on medical equipment powered by electricity. After Hurricane Helene hit Asheville in September 2024, most households were without power for one to two weeks.

Climate-Ready Construction Includes Solar Panels

Share this story

Send the public story page.

Useful takeaways from this story.

In our electricity-dependent world, being without power for an afternoon or a night can seem impossibly frustrating – and is life-threatening for people who rely on medical equipment powered by electricity.

After Hurricane Helene hit Asheville in September 2024, most households were without power for one to two weeks.

For some, in difficult to reach locations and where infrastructure destruction was worse, power was not restored for several months.

Building the complete brief

The page is ready to read now. The fuller skim-friendly version will appear here automatically.

The useful part

In our electricity-dependent world, being without power for an afternoon or a night can seem impossibly frustrating – and is life-threatening for people who rely on medical equipment powered by electricity. After Hurricane Helene hit Asheville in September 2024, most households were without power for one to two weeks. For some, in difficult to reach locations and where infrastructure destruction was worse, power was not restored for several months.

Keep reading in the app

Open the app view to save this story, compare related coverage, and continue from the same source.

Open in app