Urbanize iconUrbanizeSep 22, 2026 ~2 min source read

Renderings Reveal 323-Unit Mixed-Use Project at 305 E. Colorado St., Glendale

Kevin Tsai Architecture released plans for a pair of interconnected six-story buildings at the former United Community Church site near Brand Boulevard. The project would deliver 323 apartments, ground-floor commercial space, and 474 parking spaces, with 33 units set aside for very low-income renters.

Renderings Revealed: Mixed-use project at 305 E. Colorado St. in Glendale

Share this story

Send the public story page.

Useful takeaways from this story.

The proposal replaces United Community Church at 305 E. Colorado St. with two connected six-story buildings totaling 323 apartments and 9,143 sq ft of ground-floor commercial space.

The project would provide 474 parking spaces and set aside 33 apartments for very low-income households as part of density-bonus tradeoffs.

Kevin Tsai Architecture unveiled renderings and basic program details for a new mixed-use development proposed at 305 E. Colorado Street in Glendale. The site is currently occupied by United Community Church and sits just off Brand Boulevard, a short walk east of Glendale Central Park and the site of the Armenian American Museum.

The proposal calls for two interconnected six-story structures divided by a shared stairway that opens south onto Colorado Street. Together the buildings would contain 323 apartments made up of studios and one-, two-, and three-bedroom floor plans. The ground floor would include 9,143 square feet of commercial space and outdoor seating lining part of the ground level.

Plans show parking for 474 vehicles. Under the entitlement strategy, the applicant is pursuing density bonus incentives and related waivers. In exchange for those incentives, 33 apartments would be set aside for very low-income renters.

Renderings depict contemporary massing with stucco exterior walls, inset balconies, and wood accent details. The pair of buildings are linked visually and functionally by the central staircase and by shared material treatments. The ground level is drawn with pedestrian-facing commercial frontage and outdoor seating areas.

Entitlements and site modifications

The property sits within a mixed urban corridor near Brand Boulevard and Glendale Central Park. Construction at the nearby Armenian American Museum is expected to conclude later this year, which will change immediate pedestrian activity and neighborhood context. The project would replace a church site and add significant housing and retail frontage to this block.

What the materials show and what remains open

The released materials provide massing, façade concepts, unit count, commercial square footage, parking capacity, and the proposed affordability commitment. Details not provided in the renderings and summary include a unit mix breakdown by bedroom type, specific commercial tenancy, exact amenity layouts, construction timing, and final entitlement timelines.

This proposal is a dense, six-story residential development with ground-floor retail and significant parking that relies on density bonus incentives and an alley vacation. It aims to introduce 323 apartments into a central Glendale site while reserving a modest portion of units for very low-income households. Further public review and specific entitlement approvals will determine whether the design and program move forward unchanged.

More context around this story.

Mixed-use building starts to rise at 8000 Beverly Blvd.
Urbanize iconUrbanizeSep 16, 2026

Mixed-use building starts to rise at 8000 Beverly Blvd.

Mixed-use building starts to rise at 8000 Beverly Blvd. Steven Sharp Wed, 09/16/2026 - 06:15 Nearly two years after commencing work in Beverly Grove , a mixed-use project from South Park Group is starting to rise just west of Fairfax Avenue. Approved since 2018 for a site at 8000 W. Beverly Boulevard, work has progress

Fresh renderings for West Hollywood's Robertson Row
Urbanize iconUrbanizeSep 17, 2026

Fresh renderings for West Hollywood's Robertson Row

Fresh renderings for West Hollywood's Robertson Row Steven Sharp Thu, 09/17/2026 - 06:15 A presentation to the West Hollywood Planning Commission's Design Review Subcommittee offers a look at glossy renderings of Faring 's new plan for a commercial development centered around the historic Factory nightclub. Robertson R

Mixed-use project to rise at 225 N. 2nd Ave. in Arcadia
Urbanize iconUrbanizeSep 8, 2026

Mixed-use project to rise at 225 N. 2nd Ave. in Arcadia

Mixed-use project to rise at 225 N. 2nd Ave. in Arcadia Steven Sharp Tue, 09/08/2026 - 06:10 Last month, the City of Arcadia signed off on a proposal to develop a mixed-use project one block east of the City's A Line stop. The North Village project, which would rise from a property at 225 North 2nd Avenue, is proposed

Loading more related stories...

Keep reading in the app

Open the app view to save this story, compare related coverage, and continue from the same source.

Open in app