# What changed Pakistan officially created the Punjnad Indus River Dolphin Sanctuary in June 2026. The new protected zone in Punjab links to an existing reserve in Sindh, together forming a legally protected, continuous 400-kilometer section of the Indus River. The move aims to give the endangered Indus River dolphin, locally called the bhulan, more secure habitat along its remaining range.
# Population update A landmark 2025 abundance study published in Endangered Species Research estimated the Indus River dolphin metapopulation at about 1,987 individuals. That represents a 19.4% increase for the period 2011–2017 and points to gains following earlier conservation actions, such as the ban on dolphin hunting in the 1970s.
# Current distribution and vulnerability
- Gillnet entanglement: From 2008 to 2023, documented deaths show gillnets caused 52% of dolphin fatalities in the Indus Basin.
- Habitat fragmentation: Irrigation barrages, dams and canal networks cut the river into isolated sections, limiting movement and genetic exchange.
# Management and policy implications Officials and conservationists identify several practical requirements for long-term recovery:
- Ecological changes to barrage operations: Modifying water and fish passage at key barrages could reconnect habitats and allow dolphin movement.
- Sustainable fishing arrangements: Current auction-based commercial fishing contracts incentivize intensive harvests that increase the use of gillnets and the risk of dolphin entanglement. Community-led, gear-restricted approaches are proposed to reduce mortality.
# Why Pakistan matters for the species Indus system. A very small remnant population exists in India's Beas River, but Pakistan contains the overwhelming majority of the global population. Losses in Pakistan would leave no comparable population elsewhere.
# Recent conservation tools and monitoring Conservationists have expanded monitoring and research, including the first satellite tagging of Indus River dolphins in Pakistan. That work helps map movements, identify high-risk areas for entanglement, and inform where management actions should be concentrated.
# Immediate priorities for action
- Targeted reduction of gillnet use in dolphin-rich reaches through contract reform and gear restrictions.
- Operational adjustments at barrages to maintain ecological connectivity during critical seasons.
- Strengthened enforcement and community incentives to change fishing practices where dolphins are most abundant.
# Bottom line